تطبيق ملاط جبس الديكور و طلاء الطبقة الاخيرة

  • Decorative topcoat is applied after a drying period of 7 days after application of the plaster mortar.

  • Teknosistem Mineral Textured Decorative Plaster is applied on the surface with trowel (Figure 1).

  • A plastic trowel is passed over the surface to form a texture before it dries (Figure 2).

  • Finally, exterior wall lining and painting is applied (Figure 3).


تطبيق ملاط جبس الديكور و طلاء الطبقة الاخيرة